Gona:
Hi Dan; please see updates and answers in regards to Gona .. let me know if you have any questions please.
Upholstery
- reminder that Avi needs frank to put a piece of wood in the left side curtain pocket that's on the left wall looking at the plate form. He's going to need that to be able to support his rod.
- Avi sent his estimate to the office. I'm not able to see if it was approved by homeowner or not. Let me know please if he's on board as paint is done and he could start on the outside hidden door until carpet is in for the theater.
- Bar backsplash.... this is the mosaic that's going to be happening at the back bar. https://www.tilebar.com/magma-triangles-metallic-bronze-lava-stone-mosaic.html
- please let me know if that backsplash would also be okay with the curved front bar. We're looking to cover the difference in elevation on the inside between the 36" counter height and the 42" bar height. It's 2", I'm concerned about it being okay with the two radius on each side. Let me know your thoughts.
- carpet from AB carpet was selected and paid for and they were just on schedule. Please let me know if you'd like me to call AB to prep them.
- I notified Sirisha to order the lighting fixtures and I believe she already did. I'll get her confirmation today on them and once they're here we should be ready for final electrical.
- one thing to note for final electrical: Brett doesn't have the middle fixtures where we have the pool cue cut but I do remember speaking to him about it and I was on site as he was prepping for them. I'm not sure if he's planning to do that during finals but they're currently not there.
- Cabinet handles are still not ready for pickup. I will keep you posted once they are. I will pick them up and give them to you in person.
- She confirmed that all their appliances are in their garage and the plumbing fixtures as well. vanity is also on site. So final plumbing is good to go.
- Accessories for their restroom and cabinet handles are still not on site yet. We're expecting them soon. I'll keep you posted once they are. I will most likely give them to you in person to prevent losing them on site.
- Door handle style.
- in regards to their gym handles above, this is what she was referring to based on our on-site conversation when we were there. Please let me know if privacy handles was something they asked for as I only have approval on these kind of long bar handles: https://www.emtek.com/all-products/cabinet-hardware/cabinet-pulls/select-cabinet-rectangular-smooth-bar/?443=371257&457=371505
- other handles as needed; https://www.build.com/emtek-c5210stu/s1839815?uid=4361520
- restroom door ; yes standard slide bolt to lock bathroom is fine, preferably brass finish to work with overall aesthetic.
- I responded to Jose with approval on their exterior door. Lock/handle was sent to homeowner to order directly.
- punching bag hardware was ordered by homeowner. I'm still waiting on their confirmation of arrival.
Wallpaper and custom paint.
- I've asked multiple times to estimate the yard quantity and I really don't want to see an issue on this specially that one of them is going to take long! Sirisha keeps on asking if we can order but I need an installer to estimate and let me know to submit the orders.
- Custom paint by Bruce.... when can we expect him to start and to give samples. They're going to be requiring my attention there and I want to make sure I'm there for him when he starts.
- textured paint effect on the side of the curved tray ceiling soffits in the hallway. Is also another thing that we're waiting on. if we sent estimates for and if it's going to be Bruce or someone else. Please let me know so I can prep homeowner for other options if the estimate isn't approved on their end.
Hey kiro. Gona. Shes asking me what’s next:
- we’ll add support for avi. I’m not sure if office has his pricing
- Geovanni will look at backsplash tile. He needs counters in. I’ll check to see if Blaze is done
- update on lighting fixtures?
- update on cabinet handles?
- update on bath accessories?
- you sent me cabinet handles for the gym doors. They already have been bored for standard handles. Are we using the other handles from build that you sent instead? Or replacing the doors?
- had the entry door been paid for and ordered? Arrival date?
- Brooke was with Bruce this week for the custom painting. They’ll have pricing soon and can start soon after accepted
- I sent a text message to my group chat with you and dan Johnston when Avi sent his pricing. I believe he also emailed it.
-Geovanni was there today i believe confirming tile location and i spoke to them earlier today when he was on site.
-Blaze is not done yet, he’s going to be starting next Wednesday. He was on site picking up their sink last Monday as per Sirisha.
-Lighting Fixtures were ordered by them directly and they confirmed that it would be here in a week.
-Appliances are on site but she had to replace one of the fridges and she confirmed that I’d be here in a week as well.
-Cabinet handles and Bath Accessories are still not on site.
-I’m not sure if you recall but during our on-site meeting back in January 02 when frank was still working. we discussed having the long bar handles and just putting interior header bolt lock from the inside for it.
-I emailed Jose last Monday, I will get a follow up with him on that as well to see if he collected payment and has a lead time on it.
-I spoke to Brooke about it already yes and they’re going to be working on getting pricing and starting him soon.
- carpet from AB carpet was selected and paid for and they were just on schedule. Please let me know if you'd like me to call AB to prep them.